MPUD Wastewater Treatment Plant & Lift Station
Livingston, Texas
A new 0.20 MGD wastewater treatment plant was designed to replace the District’s existing treatment plant. In addition, the District’s main lift station configuration was a wet-well / dry-well reinforced concrete structure with two suction lift, self-priming pumps. The lift station was renovated and converted to a single wet well with three submersible pumps to better accommodate influent flow fluctuations in addition to providing a redundant “back-up” pump.